So framing is almost totally done with the exception of the master bathroom and one wall on the 3rd floor and the stair bump out (seen here). It looks ginormous to me! The only room that seems small to me so far is the playroom but that's ok. Snow has now fallen on the house and J spent the day today renting a chainsaw and cutting down half fallen trees in the back. Saved a whopping 1000$ we were quoted and just spent 50 on the rental of the chainsaw. Hopefully this thing will be roofed in a little after Christmas! The next challenge will be pouring concrete over the garage for the floor of the screened/glassed in porch on the main floor. Our builder is up for it so we are moving forward, it is going to be awesome! Can't wait to see a roof and some drywall and siding on this bad boy!
Saturday, December 19, 2009
what a wall
So framing is almost totally done with the exception of the master bathroom and one wall on the 3rd floor and the stair bump out (seen here). It looks ginormous to me! The only room that seems small to me so far is the playroom but that's ok. Snow has now fallen on the house and J spent the day today renting a chainsaw and cutting down half fallen trees in the back. Saved a whopping 1000$ we were quoted and just spent 50 on the rental of the chainsaw. Hopefully this thing will be roofed in a little after Christmas! The next challenge will be pouring concrete over the garage for the floor of the screened/glassed in porch on the main floor. Our builder is up for it so we are moving forward, it is going to be awesome! Can't wait to see a roof and some drywall and siding on this bad boy!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment